MATRIX MANUFACTURING COMPANY

 

SHORT TRACTION MAT (P/N MB 101S) & LONG TRACTION MAT (P/N MB 101L) & LONG RUBBER STUD MAT (P/N MB119)

INSTALLATION INSTRUCTIONS

         

  Nine (9) screws have  been included for installing your short mat .

  Fifteen (15) screws have  been included for installing your long mat

You will need a Phillips #2 power screw bit and a screw gun or power drill

to install your traction mats.

 

          The drawing below shows the approximate location of where the screws should go when fastening the mats to your trailer.  After determining where the traction mat will sit, drive the screws through the mat and into the deck of the trailer until the screw head is flush with the top of the mat.  If you are screwing through any aluminum extrusion, you will need to drill a pilot hole first to ease installation.  Do not overtighten.

Short Mat (9 Screws)

Long Mat (15 Screws)

 

Great care has been taken to ensure a complete hardware kit.  However, if you find that any components are missing, please call us at 763-389-3898 or contact us by e-mail at matrix@sherbtel.net. 

Visit us on the web at www.matrixmfg.com

 

MANUFACTURER’S WARRANTY

This product will be repaired or replaced up to three years from the

date of purchase if defective due to workmanship or material.